Online Information Repository Index - by Site
information repository graphic

Below is a list of materials that can be found on CD in the RFAAP Information Repository at Montgomery-Floyd Regional Library in Christiansburg, Virginia. Current and past Installation Action Plans (IAPs) for the facility can be found on the following web page IAPs. In addition, Restoration Advisory Board Meeting Minutes can be found in the following web page RAB Minutes.

Note: This index is sorted by site. Installation-wide documents are first, followed by:

SWMUs,
HWMUs,
Site Screening Areas,
New River Unit,
Areas of Concern (AOCs).

To return to the chronlogical index, click here

ID Number Title Approval Date
Installation Wide Documents
1987-01 RCRA Facility Assessment of Radford Army Ammunition Plant 06-08-1987

1990-01

"Task Order No. 16, Verification Investigation Work Plan, for Radford Army Ammunition Plant, Virginia. Volume 1, Part A."

08-29-1990

1992-01 "Preliminary Assessment Report Addendum for Radford Army Ammunition Plant, VA" 03-01-1992
1992-02  "RCRA Facility Investigation, Volume I (Section 1.0 through 10.0) and Volume II (Appendix A through J), Task Order No. 4, Radford Army Ammunition Plant, Virginia." 10-29-1992
1992-03-V1 "Task Order No. 4, Final Draft Verification Investigation, Radford Army Ammunition Plant, Virginia, Volume I of III" 10-29-1992
1992-03-V2 "Task Order No. 4, Final Draft Verification Investigation, Radford Army Ammunition Plant, Virginia, Volume II of III" 10-29-1992

1992-03-V3

"Task Order No. 4, Final Draft Verification Investigation, Radford Army Ammunition Plant, Virginia, Volume III of III"

10-29-1992

1994-08 "Radford Army Ammunition Plant, Benthic Study, October 24, 1994." 10-24-1994
1995-01 "Community Relations Plan, Radford Army Ammunition Plant, Virginia" 09-05-1995
1995-02 "Radford Army Ammunition Plant, Benthic Study, November 2, 1995." 11-02-1995
1996-02 "Radford Army Ammunition Plant, Benthic Study, September 23, 1996." 09-23-1996
1997-01 "Radford Army Ammunition Plant, Benthic Study, September 22, 1997." 09-22-1997
1997-02 "Revised New River and Tributaries Study, Radford Army Ammunition Plant, Virginia." 12-01-1997
1999-01 "Biological Survey of the Radford Army Ammunition Plant; including Threatened, Endangered & Species of Concern, Final Report" 05-01-1999
1998-05 "Radford Army Ammunition Plant, Benthic Study, September 23, 1998." 09-23-1998
1999-03 Screening Ecological Risk Assessment 09-01-1999
2000-01 "RFI and VI Field Borings (1991), Radford Army Ammunition Plant, Radford, VA." 08-01-2000
2000-02 "Radford Army Ammunition Plant, Virginia, Master Work Plan, Quality Assurance Plan, Health and Safety Plan Addendum 010: Facility-Wide Background Study, Final Document." 9-01-2000

2000-03

Correspondence

USEPA Permit for Corrective Action and Waste Minimization; Pursuant to the Resource Conservation and Recovery Act as Amended by the Hazardous and Solid Waste Amendments of 1984 (Permit Number VA1210020730) 09-26-2000
2001-03 "Facility-Wide Background Study Report, Radford Army Ammunition Plant, Virginia." 12-01-2001
2001-04 "Site Screening Process (SSP) Guidance - Final" 10-26-2001
2002-01 "National Wetland Inventory Report for Radford Army Ammunition Plant, Montgomery and Polaski Counties, Virginia." 01-01-2002
2002-08 "Final Closed, Transferring and Transferred Range / Site Inventory Report, Radford Army Ammunition Plant, Virginia." 11-12-2002
2003-03 "Final Master Work Plan, Radford Army Ammunition Plant, Radford, Virginia. " 08-01-2003
2004-04 "Insert Figures for Multiple SWMUs, Radford Army Ammunition Plant, Radford, Virginia." 02-01-2004
2004-09 Radford Army Ammunition Plant Community Relations Plan January 2004
2005-02 "Current Conditions Report, Horseshoe Area, Radford Army Ammunition Plant, Virginia." 08-01-2005
2008-01 Historical Records Review - Radford Army Ammunition Plant, Virginia -Military Munitions Response Program. Final January-2008
2008-05 Master Work Plan Addendum 024: MMRP Site Screening Process. Final. September, 2008 October 1, 2008

2009-07

Final Class 3 Hazardous Waste Permit Modification to the Final Hazardous Waste Management Post-Closure Care Permit. Radford Army Ammunition Plant, Radford, VA. November, 2009

November 5, 2009

2011-13

Sites Determined To Be Exempt From Permit Status. RFAAP, Radford, VA. Final. April, 2010. April-2010

2012-04

Final Decision and Response to Comments (Statement of Basis). Radford Army Ammunition Plant, Radford, VA. Final. April, 2012

April-2012

2014-03

Attachment A - Unit Status. March, 2014

March 31, 2014

2014-05

Attachment A - Unit Status. June, 2014

June 27, 2014

2014-09

United States Environmental Protection Agency Region III - Final Decision and Response to Comments Radford Army Arsenal. August, 18, 2014

August 18, 2014

2016-03

Hazardous Waste Management Permit for Corrective Action (EPA I.D. No. VA1210020730)

April, 2016
2018-10 Final Second Periodic Review Report for Radford Army Ammunition Plant, Radford Virginia, August 2018 August 2018
SWMU 6 -Acid Wastewater Lagoon
2000-04 "Master Work Plan, Quality Assurance Plan, Health and Safety Plan; Addendum No. 11, Soil Sampling and Reporting at SWMU 6, Radford Army Ammunition Plant, Virginia." 11-01-2000
2001-02 "SWMU 6 Sampling Results Report, Radford Army Ammunition Plant, Virginia." 05-01-2001
2002-07 "SWMU 6 Decision Document, Radford Army Ammunition Plant, Radford, Virginia" 10-01-2002
SWMU 8 -CaSO4 Treatment/Disposal Area
1998-06 "Closure Report for the Eastern Lagoon of SWMU 8, Radford Army Ammunition Plant" 12-14-1998
2003-02 "Final Work Plan Addendum No. 15: Soil Sampling Investigation for SWMUs 8 and 36, Radford Army Ammunition Plant, Radford, Virginia." 03-01-2003
2004-01 "Soil Screening Report, SWMUs 8 and 36, Radford Army Ammunition Plant, Radford, Virginia. " 01-01-2004
SWMU 10 & 35 - BioPlant Basin
1992-03-V1 "Task Order No. 4, Final Draft Verification Investigation, Radford Army Ammunition Plant, Virginia, Volume I of III" 10-29-1992
1992-03-V2 "Task Order No. 4, Final Draft Verification Investigation, Radford Army Ammunition Plant, Virginia, Volume II of III" 10-29-1992

1992-03-V3

"Task Order No. 4, Final Draft Verification Investigation, Radford Army Ammunition Plant, Virginia, Volume III of III"

10-29-1992

1994-06 "Verification Investigation, Revised Section 7, SWMUs 10 & 35, Task Order No. 4, Radford Army Ammunition Plant, Virginia." 09-08-1994
1998-02-V1 "Closure Documentation for Solid Waste Management Unit 10, Biological Treatment Plant Equalization Basin, Radford Army Ammunition Plant, Radford, VA, Volume 1 of 2" 01-20-1998
1998-02-V2 "Closure Documentation for Solid Waste Management Unit 10, Biological Treatment Plant Equalization Basin, Radford Army Ammunition Plant, Radford, VA, Volume 2 of 2" 01-20-1998
1998-03 "Correspondences - Risk Assessment and Closure Certification for the Former Bioplant Equalization Basin, Radford Army Ammunition Plant, Radford, VA" 07-10-1998
1998-04 "Risk Assessment and Closure Certification for the Former Bioplant Equalization Basin, Radford Army Ammunition Plant" 07-22-1998
2007-08 Work Plan Addendum 020: RCRA Facility Investigation at Solid Waste Management Units 35, 37, 38, and Area of Concern Q. Final October-2007
2010-05 Solid Waste Management Units 35, 37, 38 and Area of Concern Q (RAAP-10) RCRA Facility Investigation. Radford Army Ammunition Plant, Radford, VA. Final. September, 2010. September-2010
SWMU 13 - Area Outside OBG
2003-04 "Work Plan Addendum No. 16, Site Screening Process for Solid Waste Management Units 13, 37, 38, 46, 57, 68, 69, 75, 76, and Areas of Concern A, F, Q, Radford Army Ammunition Plant, Radford, Virginia." 08-01-2003
2006-02

Eastern Horseshoe Area, HWMU 16 & SWMUs 13, 48, 49, 50, 51 and 59 April 2006 Sampling Event Groundwater Data Report. Radford Army Ammunition Plant, Radford, Virginia.

Note: This report was submitted as an internal draft in support of an Army Aquisition

June-2006
2008-03 Work Plan Addendum 023: RFI at SWMU 13, Radford Army Ammunition Plant, Virginia. Final. July, 2008 July-2008
2010-04 Study Area at Solid Waste Management Unit 13, RCRA Facility Investigation. Radford Army Ammunition Plant, Radford, VA. Final. July, 2010. July-2010
SWMU 17 - Air Curtain Destructor and Open Burning

1994-01

1994-01rev

"Dye-Tracing Study Report, Radford Army Ammunition Plant"

Amended Version Sept 1994

03-01-1994

09-01-1994

1996-01-V1 "RCRA Facility Investigation for Solid Waste Management Units 17, 31, 48 & 54 at Radford Army Ammunition Plant, Virginia." 01-17-1996
1996-01-V2 "RCRA Facility Investigation for Solid Waste Management Units 17, 31, 48 & 54, Volume II: Appendices, Radford Army Ammunition Plant, Virginia." 01-17-1996

2011-11

Corrective Action Unit Evaluation for SWMU 17. RFAAP, Radford, VA. Final. October, 2010. October-2010
SWMU 27 -CaSO4 Treatment/Disposal Area
1992-03-V1 "Task Order No. 4, Final Draft Verification Investigation, Radford Army Ammunition Plant, Virginia, Volume I of III" 10-29-1992
1992-03-V2 "Task Order No. 4, Final Draft Verification Investigation, Radford Army Ammunition Plant, Virginia, Volume II of III" 10-29-1992

1992-03-V3

"Task Order No. 4, Final Draft Verification Investigation, Radford Army Ammunition Plant, Virginia, Volume III of III"

10-29-1992

1994-02 "Verification Investigation Revised Section 9.0, SWMU 27, 29 and 53, Task Order No. 4, Radford Army Ammunition Plant, Virginia" 08-19-1994
SWMU 29 - Fly Ash Landfill #2
1992-03-V1 "Task Order No. 4, Final Draft Verification Investigation, Radford Army Ammunition Plant, Virginia, Volume I of III" 10-29-1992
1992-03-V2 "Task Order No. 4, Final Draft Verification Investigation, Radford Army Ammunition Plant, Virginia, Volume II of III" 10-29-1992

1992-03-V3

"Task Order No. 4, Final Draft Verification Investigation, Radford Army Ammunition Plant, Virginia, Volume III of III"

10-29-1992

1994-02 "Verification Investigation Revised Section 9.0, SWMU 27, 29 and 53, Task Order No. 4, Radford Army Ammunition Plant, Virginia" 08-19-1994
SWMU 31 - Ground Coal Ash Settling Lagoons
1996-01-V1 "RCRA Facility Investigation for Solid Waste Management Units 17, 31, 48 & 54 at Radford Army Ammunition Plant, Virginia." 01-17-1996
1996-01-V2 "RCRA Facility Investigation for Solid Waste Management Units 17, 31, 48 & 54, Volume II: Appendices, Radford Army Ammunition Plant, Virginia." 01-17-1996
2002-05 "Master Workplan Addendum No. 009 : SWMU 31 and Horseshoe Area Groundwater Study, Radford Army Ammunition Plant, Virginia." 09-01-2002

2007-04

Appendices

SWMU 31 RCRA Facility Investigation, Radford Army Ammunition Plant, Radford, Virginia July-2007

2009-13

Final RFI Addendum. SWMU 31 (RAAP-026): Coal Ash Settling Lagoons. Radford Army Ammunition Plant, Radford, VA. October, 2009

December 14, 2009
SWMU 36 -CaSO4 Drying Bed
2003-02 "Final Work Plan Addendum No. 15: Soil Sampling Investigation for SWMUs 8 and 36, Radford Army Ammunition Plant, Radford, Virginia." 03-01-2003
2004-01 "Soil Screening Report, SWMUs 8 and 36, Radford Army Ammunition Plant, Radford, Virginia. " 01-01-2004
SWMU 37 - CaSO4 Treatment/Disposal Area
2003-04 "Work Plan Addendum No. 16, Site Screening Process for Solid Waste Management Units 13, 37, 38, 46, 57, 68, 69, 75, 76, and Areas of Concern A, F, Q, Radford Army Ammunition Plant, Radford, Virginia." 08-01-2003
2007-02 Site Screening Process Report for Solid Waste Management Units 13, 37, 38, 46, 57, 68, 69, and Areas of Concern A, F, Q, Final, May 2007 06-26-2007
2010-05 Solid Waste Management Units 35, 37, 38 and Area of Concern Q (RAAP-10) RCRA Facility Investigation. Radford Army Ammunition Plant, Radford, VA. Final. September, 2010. September-2010
SWMU 38 - CaSO4 Treatment/Disposal Area
2003-04 "Work Plan Addendum No. 16, Site Screening Process for Solid Waste Management Units 13, 37, 38, 46, 57, 68, 69, 75, 76, and Areas of Concern A, F, Q, Radford Army Ammunition Plant, Radford, Virginia." 08-01-2003
2007-02 Site Screening Process Report for Solid Waste Management Units 13, 37, 38, 46, 57, 68, 69, and Areas of Concern A, F, Q, Final, May 2007 06-26-2007
2010-05 Solid Waste Management Units 35, 37, 38 and Area of Concern Q (RAAP-10) RCRA Facility Investigation. Radford Army Ammunition Plant, Radford, VA. Final. September, 2010. September-2010
SWMU 39 - Wastewater Ponds from Propellant Incinerator
1992-03-V1 "Task Order No. 4, Final Draft Verification Investigation, Radford Army Ammunition Plant, Virginia, Volume I of III" 10-29-1992
1992-03-V2 "Task Order No. 4, Final Draft Verification Investigation, Radford Army Ammunition Plant, Virginia, Volume II of III" 10-29-1992

1992-03-V3

"Task Order No. 4, Final Draft Verification Investigation, Radford Army Ammunition Plant, Virginia, Volume III of III"

10-29-1992

1994-05 "Verification Investigation Revised Section 11.0, SWMU 39, Incinerator Wastewater Ponds, Task Order No. 4, Radford Army Ammunition Plant, Virginia" 08-31-1994
2002-06 "Workplan Addendum 012 : Site Characterization Plan for SWMUs 39, 48, 49, 50, 58, & 59, AOC-FLFA, AOC-Building 4343 & New River Unit, Radford Army Ammunition Plant, Virginia." 09-01-2002
2002-06-A "Work Plan Addendum 012, Appendix A: Previous Investigation Analytical Results Tables, Site Characterization Plan for SWMUs 39, 48, 49, 50, 58, & 59, AOC-FLFA, AOC-Building 4343 & New River Unit, Radford Army Ammunition Plant, Virginia." 09-01-2002
2005-01 "SWMU 39 RCRA Facility Investigation / Corrective Measures Study Report, Radford Army Ammunition Plant, Radford, Virginia." 06-01-2005
2008-04 SWMU 39 Interim Measures Work Plan, Radford Army Ammunition Plant, Virginia. Final. July, 2008 October 1, 2008

2010-02

Appendices

Interim Measures Completion Report: SWMU 51, SWMU 39 and FLFA. Radford Army Ammunition Plant, Radford, VA. Final. February, 2010. February-2010
SWMU 40 -Landfill Nitro Area
2002-04 "Workplan Addendum No. 14, RCRA Facility Investigation at Solid Waste Management Unit 40/71, Radford Army Ammunition Plant, Virginia." 09-01-2002
2007-11 Solid Waste Management Unit 40 (Nitro Landfill). Geophysical Investigation Report. Radford Army Ammunition Plant, Radford VA. Draft. March, 2007 May 24, 2007

2009-01

Vol 1

Vol 2

Solid Waste Management Units 40 (RAAP-009) and 71 (RAAP-002) RCRA Facility Investigation/ Corrective Measures Study Report. Radford Army Ammunition Plant, Radford, VA. Final. April, 2009

June 30, 2009

2011-17

Solid Waste Management Unit (SWMU) 40 (RAAP-009) Interim Measures Work Plan. Radford Army Ammunition Plant, Radford, VA. Final. September, 2011 September-2011

2012-01

Final Solid Waste Management Unit (SWMU) 40 (RAAP-009) Interim Measures Completion Report. Radford Army Ammunition Plant, Radford, VA. Final. May, 2012 May-2012

2013-01

Appendices

Final Solid Waste Management Unit (SWMU) 40 (RAAP-009) Year 1 Long Term Monitoring Report. Radford Army Ammunition Plant, Radford, VA. Final. April, 2013 April-2013

2014-01

SWMU 40 (RAAP-009) Landfill Nitro Area Annual Long Term Monitoring Report. Radford Army Ammunition Plant, Radford, VA. Draft. October, 2013

Note: The Draft LTM Report was approved without changes by USEPA and VDEQ and is considered Final

January 07, 2014

2014-06

Data Validation Reports

Analytical Data

SWMU 40 (RAAP-009) Landfill Nitro Area Year 3 Long Term Monitoring Report. Radford Army Ammunition Plant, Radford, VA. Draft. July, 2014

Note: The Draft Final LTM Report was approved without changes by USEPA and VDEQ and is considered Final

September 9 , 2014

2015-02

Appendices

SWMU 40 (RAAP 009) Annual Long Term Monitoring Report, Year 4. Radford Army Ammunition Plant, Radford, VA. Draft Final. March, 2015

Note: The Draft Final Report was approved without changes by USEPA and VDEQ and is considered Final

May 5, 2015

2015-04

SWMU 40 (RAAP 009) Landfill Nitro Area. Remedy Review. Radford Army Ammunition Plant, Radford, VA. Draft Final. May, 2015

Note: The Draft Final Report was approved without changes by USEPA and VDEQ and is considered Final

July 7, 2015
SWMU 41 -Red Water Ash Burial Ground
2003-06 "Work Plan Addendum No. 18, RCRA Facility Investigation at Solid Waste Management Unit 41, Radford Army Ammunition Plant, Radford, Virginia." 12-01-2003
2007-07 Master Work Plan Addendum 019: SWMUs 48, 49, 50, 59, 41, Area O, FLFA, SWMU 43 and Area P. Final November-2007

2011-02

Appendices

Final SWMU 41 RCRA Facility Investigation Report. Radford Army Ammunition Plant, Radford, VA. Final. February, 2011. February-2011
SWMU 43 - Sanitary Landfill #2
2007-07 Master Work Plan Addendum 019: SWMUs 48, 49, 50, 59, 41, Area O, FLFA, SWMU 43 and Area P. Final November-2007

2011-01

Appendices

Final SWMU 43 RCRA Facility Investigation Report. Radford Army Ammunition Plant, Radford, VA. Final. January, 2011. January-2011
SWMU 45 - Landfill #3
2007-10 Master Work Plan Addendum 022: Site Screening Process at Solid Waste Management Unit 45. Final December-2007
2010-01 Solid Waste Management Unit 45 (RAAP-24) Site Screening Process Report. Radford Army Ammunition Plant, Radford, VA. Final. January, 2010. January-2010
SWMU 46 - Propellant Burial
2003-04 "Work Plan Addendum No. 16, Site Screening Process for Solid Waste Management Units 13, 37, 38, 46, 57, 68, 69, 75, 76, and Areas of Concern A, F, Q, Radford Army Ammunition Plant, Radford, Virginia." 08-01-2003
2007-02 Site Screening Process Report for Solid Waste Management Units 13, 37, 38, 46, 57, 68, 69, and Areas of Concern A, F, Q, Final, May 2007 06-26-2007
2007-06 Decision Documents for:
SWMU 46: Propellant Burial Area, SWMU 68: Chromic Acid Treatment Tanks,
SWMU 69: Pond by Chromic Acid Treatment Tanks,
SWMU 75: Used Oil Storage Tank (Inert Gas Plant),
SWMU 76: Oil Tanks,
AOC F: Former Drum Storage Area,
No Further Action
August-2007
SWMU 48 -Oily Water Burial Area
1996-01-V1 "RCRA Facility Investigation for Solid Waste Management Units 17, 31, 48 & 54 at Radford Army Ammunition Plant, Virginia." 01-17-1996
1996-01-V2 "RCRA Facility Investigation for Solid Waste Management Units 17, 31, 48 & 54, Volume II: Appendices, Radford Army Ammunition Plant, Virginia." 01-17-1996
2002-06 "Workplan Addendum 012 : Site Characterization Plan for SWMUs 39, 48, 49, 50, 58, & 59, AOC-FLFA, AOC-Building 4343 & New River Unit, Radford Army Ammunition Plant, Virginia." 09-01-2002
2002-06-A "Work Plan Addendum 012, Appendix A: Previous Investigation Analytical Results Tables, Site Characterization Plan for SWMUs 39, 48, 49, 50, 58, & 59, AOC-FLFA, AOC-Building 4343 & New River Unit, Radford Army Ammunition Plant, Virginia." 09-01-2002
2006-02

Eastern Horseshoe Area, HWMU 16 & SWMUs 13, 48, 49, 50, 51 and 59 April 2006 Sampling Event Groundwater Data Report. Radford Army Ammunition Plant, Radford, Virginia.

Note: This report was submitted as an internal draft in support of an Army Aquisition

June-2006
2007-07 Master Work Plan Addendum 019: SWMUs 48, 49, 50, 59, 41, Area O, FLFA, SWMU 43 and Area P. Final November-2007

2011-14

Appendices

Solid Waste Management Unit (SWMU) 48 Interim Measures Work Plan. Radford Army Ammunition Plant, Radford, VA. Draft. June, 2011

Note: The Draft Work Plan was approved without changes by USEPA and VDEQ and is considered Final

June-2011

2014-04

Correspondence

Appendices

SWMU 48/49 RCRA Facility Investigation (RFI) Report. Radford Army Ammunition Plant, Radford, VA. Draft. January, 2014

Note: The Draft RFI Report was approved without changes by USEPA and VDEQ and is considered Final

Jan-2014
SWMU 49 -Red Water Ash Burial #2
1996-01-V1 "RCRA Facility Investigation for Solid Waste Management Units 17, 31, 48 & 54 at Radford Army Ammunition Plant, Virginia." 01-17-1996
1996-01-V2 "RCRA Facility Investigation for Solid Waste Management Units 17, 31, 48 & 54, Volume II: Appendices, Radford Army Ammunition Plant, Virginia." 01-17-1996
2002-06 "Workplan Addendum 012 : Site Characterization Plan for SWMUs 39, 48, 49, 50, 58, & 59, AOC-FLFA, AOC-Building 4343 & New River Unit, Radford Army Ammunition Plant, Virginia." 09-01-2002
2002-06-A "Work Plan Addendum 012, Appendix A: Previous Investigation Analytical Results Tables, Site Characterization Plan for SWMUs 39, 48, 49, 50, 58, & 59, AOC-FLFA, AOC-Building 4343 & New River Unit, Radford Army Ammunition Plant, Virginia." 09-01-2002
2006-02

Eastern Horseshoe Area, HWMU 16 & SWMUs 13, 48, 49, 50, 51 and 59 April 2006 Sampling Event Groundwater Data Report. Radford Army Ammunition Plant, Radford, Virginia.

Note: This report was submitted as an internal draft in support of an Army Aquisition

June-2006
2007-07 Master Work Plan Addendum 019: SWMUs 48, 49, 50, 59, 41, Area O, FLFA, SWMU 43 and Area P. Final November-2007

2014-04

Correspondence

Appendices

SWMU 48/49 RCRA Facility Investigation (RFI) Report. Radford Army Ammunition Plant, Radford, VA. Draft. January, 2014

Note: The Draft RFI Report was approved without changes by USEPA and VDEQ and is considered Final

Jan-2014

2014-07

SWMU 49 Monitored Natural Attenuation Groundwater Monitoring Work Plan. Radford Army Ammunition Plant, Radford, VA. Draft Final. October, 2014

Note: The Draft Final Work Plan was approved without changes by USEPA and VDEQ and is considered Final

December 1, 2014

2015-07

Data Packages

Appendices

Certification Letter

Sampling Results

SWMU 49 Monitored Natural Attenuation Sampling Baseline Report. Radford Army Ammunition Plant, Radford, VA. Draft Final. July, 2015

September, 2015

2017-04

2017-04 Corr

SWMU 49 Monitored Natural Attenuation Sampling Year One Report. Radford Army Ammunition Plant, Radford, VA. Final. May, 2017

June, 2017
2018-03

2018-03 App A

2018-03 App B-1

2018-03 App B-2

2018-03 Corr

SWMU 49 Monitored Natural Attenuation Sampling Year Two Report. Radford Army Ammunition Plant, Radford, VA May 2018

2019-03

2019-03 Corr

 

Final SWMU 49 Monitored Natural Attenuation Sampling Year Three Report. Radford Army Ammunition Plant, Radford, VA

April 2019

2020-01

2020-01_Corr

Final SWMU 49 Monitored Natural Attenuation Sampling Year Four Report February 2020
SWMU 50-CaSO4 Treatment/Disposal Area
2002-06 "Workplan Addendum 012 : Site Characterization Plan for SWMUs 39, 48, 49, 50, 58, & 59, AOC-FLFA, AOC-Building 4343 & New River Unit, Radford Army Ammunition Plant, Virginia." 09-01-2002
2002-06-A "Work Plan Addendum 012, Appendix A: Previous Investigation Analytical Results Tables, Site Characterization Plan for SWMUs 39, 48, 49, 50, 58, & 59, AOC-FLFA, AOC-Building 4343 & New River Unit, Radford Army Ammunition Plant, Virginia." 09-01-2002
2006-02

Eastern Horseshoe Area, HWMU 16 & SWMUs 13, 48, 49, 50, 51 and 59 April 2006 Sampling Event Groundwater Data Report. Radford Army Ammunition Plant, Radford, Virginia.

Note: This report was submitted as an internal draft in support of an Army Aquisition

June-2006
2007-07 Master Work Plan Addendum 019: SWMUs 48, 49, 50, 59, 41, Area O, FLFA, SWMU 43 and Area P. Final November-2007

2009-08

Appendices

Final SWMU 50 & 59 RCRA Facility Investigation Report. Radford Army Ammunition Plant, Radford, VA. September, 2009

October 23, 2009
SWMU 51 - TNT Waste Neutralization Pits
2004-06 "Work Plan Addendum No. 17, SWMU 51 RCRA Facility Investigation, Radford Army Ammunition Plant, Radford, Virginia." 02-26-2004
2006-02

Eastern Horseshoe Area, HWMU 16 & SWMUs 13, 48, 49, 50, 51 and 59 April 2006 Sampling Event Groundwater Data Report. Radford Army Ammunition Plant, Radford, Virginia.

Note: This report was submitted as an internal draft in support of an Army Aquisition

June-2006

2008-07

Appendices

SWMU 51 RCRA Facility Investigation/ Corrective Measures Study. Radford Army Ammunition Plant, Radford, VA. Final. July, 2008 October 16, 2008

2008-08

Appendices

SWMU 51 Interim Measures Work Plan. Radford Army Ammunition Plant, Radford, VA. Draft. July, 2008

Note: The Draft Work Plan was approved without changes by USEPA and VDEQ and is considered Final

October 22, 2008

2010-02

Appendices

Interim Measures Completion Report: SWMU 51, SWMU 39 and FLFA. Radford Army Ammunition Plant, Radford, VA. Final. February, 2010. February-2010
SWMU 53 - Activated Carbon Disposal Area
1992-03-V1 "Task Order No. 4, Final Draft Verification Investigation, Radford Army Ammunition Plant, Virginia, Volume I of III" 10-29-1992
1992-03-V2 "Task Order No. 4, Final Draft Verification Investigation, Radford Army Ammunition Plant, Virginia, Volume II of III" 10-29-1992

1992-03-V3

"Task Order No. 4, Final Draft Verification Investigation, Radford Army Ammunition Plant, Virginia, Volume III of III"

10-29-1992

1994-02 "Verification Investigation Revised Section 9.0, SWMU 27, 29 and 53, Task Order No. 4, Radford Army Ammunition Plant, Virginia" 08-19-1994
SWMU 54 -Propellant Burning Ash Disposal Area
1996-01-V1 "RCRA Facility Investigation for Solid Waste Management Units 17, 31, 48 & 54 at Radford Army Ammunition Plant, Virginia." 01-17-1996
1996-01-V2 "RCRA Facility Investigation for Solid Waste Management Units 17, 31, 48 & 54, Volume II: Appendices, Radford Army Ammunition Plant, Virginia." 01-17-1996
2002-03 "Workplan Addendum No. 13, RCRA Facility Investigation at Solid Waste Management Unit 54, Radford Army Ammunition Plant, Virginia." 09-01-2002
2004-08 "SWMU 54 Additional Work Characterization: Work Instructions, Radford Army Ammunition Plant, Radford, Virginia." 07-01-2004

2008-09- Volume I

SWMU 54 RCRA Facility Investigation/ Corrective Measures Study. Radford Army Ammunition Plant, Radford, VA. Volume I. Final. September, 2008

06-01-1985

2008-09- Volume II

SWMU 54 RCRA Facility Investigation/ Corrective Measures Study. Radford Army Ammunition Plant, Radford, VA. Volume II. Final. September, 2008

10-05-1990

2010-12

Appendices

Final SWMU 54 IM Work Plan. Radford Army Ammunition Plant, Radford, VA. Final. January, 2010. Februray 2 -2010

2011-06

Appendices

Final SWMU 54 Monitored Natural Attenuation IM Work Plan. Radford Army Ammunition Plant, Radford, VA. Final. April, 2011. April-2011

2011-15

Appendices

Solid Waste Management Unit (SWMU) 54 (RAAP-14) Interim Measures Completion Report. Radford Army Ammunition Plant, Radford, VA. Draft. April, 2011

Note: The Draft Comletion Report was approved without changes by USEPA and VDEQ and is considered Final

August-2011

2013-04

Appendices

SWMU 54 Monitored Natural Attenuation Sampling Year One Report. Radford Army Ammunition Plant, Radford, VA. Draft. February, 2013

Note: The Draft Year 1 Report was approved without changes by USEPA and VDEQ and is considered Final

February-2013

2013-07

Appendices

SWMU 54 Monitored Natural Attenuation Year 2 Sampling Report. Radford Army Ammunition Plant, Radford, VA. Final. December, 2013

December 23, 2013

2015-03

Appendices

SWMU 54 Monitored Natural Attenuation Year 3 Sampling Report. Radford Army Ammunition Plant, Radford, VA. Draft. October, 2014

Note: The Draft Year 3 Report was approved without changes by USEPA and VDEQ and is considered Final

June 16, 2015

2017-03

2017-03 Corr

2017-03 App A

2017-03 App B-1

2017-03 App B-2

SWMU 54 Monitored Natural Attenuation Year 4 Sampling Report. Radford Army Ammunition Plant, Radford, VA. Draft Final. December, 2016

Note: The Draft Final Year 4 Report was approved without changes by the VDEQ and is considered Final

April, 2017

2019-04

2019-04 Corr

 

Final SWMU 54 Monitored Natural Attenuation Sampling Year Six Report. Radford Army Ammunition Plant, Radford, VA

April 2019

2020-02

2020-02_Corr

Draft Final SWMU 54 Monitored Natural Attenuation Sampling Year Seven Report Januaryn99
SWMU 57 - Pond by Building 4931/4932
2003-04 "Work Plan Addendum No. 16, Site Screening Process for Solid Waste Management Units 13, 37, 38, 46, 57, 68, 69, 75, 76, and Areas of Concern A, F, Q, Radford Army Ammunition Plant, Radford, Virginia." 08-01-2003
2007-02 Site Screening Process Report for Solid Waste Management Units 13, 37, 38, 46, 57, 68, 69, and Areas of Concern A, F, Q, Final, May 2007 06-26-2007
2007-09 Master Work Plan Addendum 021: RCRA Facility Investigation at Solid Waste Management Unit 57. Final October-2007

2009-04

SWMU 57 (RAAP-022) RCRA Facility Investigation/Corrective Measures Study Report. Radford Army Ammunition Plant, Radford, VA. Final. September, 2009.

September 21, 2009
2010-09

Draft Final Interim Measures Work Plan for SWMU 57. Radford Army Ammunition Plant, Radford, VA. Draft Final. November, 2010.

Note: The Draft Final Work Plan was approved without changes by EPA/VDEQ and is considered Final

November-2010

2011-16

Appendices

Solid Waste Management Unit (SWMU) 57 (RAAP-22) Interim Measures Completion Report. Radford Army Ammunition Plant, Radford, VA. Draft Final. June, 2011

Note: The Draft Final Comletion Report was approved without changes by USEPA and VDEQ and is considered Final

August-2011
SWMU 58 - Rubble Pile
2002-06 "Workplan Addendum 012 : Site Characterization Plan for SWMUs 39, 48, 49, 50, 58, & 59, AOC-FLFA, AOC-Building 4343 & New River Unit, Radford Army Ammunition Plant, Virginia." 09-01-2002
2002-06-A "Work Plan Addendum 012, Appendix A: Previous Investigation Analytical Results Tables, Site Characterization Plan for SWMUs 39, 48, 49, 50, 58, & 59, AOC-FLFA, AOC-Building 4343 & New River Unit, Radford Army Ammunition Plant, Virginia." 09-01-2002
2003-05 "SWMU 58 RCRA Facility Investigation Report, Radford Army Ammunition Plant, Radford, Virginia." 12-01-2003
2004-10 "Decision Document - SWMU 58: Rubble Pile - No Further Action." Radford Army Ammunition Plant, Radford, Virginia. Final August 2004
SWMU 59 - Bottom Ash Pile
2002-06 "Workplan Addendum 012 : Site Characterization Plan for SWMUs 39, 48, 49, 50, 58, & 59, AOC-FLFA, AOC-Building 4343 & New River Unit, Radford Army Ammunition Plant, Virginia." 09-01-2002
2002-06-A "Work Plan Addendum 012, Appendix A: Previous Investigation Analytical Results Tables, Site Characterization Plan for SWMUs 39, 48, 49, 50, 58, & 59, AOC-FLFA, AOC-Building 4343 & New River Unit, Radford Army Ammunition Plant, Virginia." 09-01-2002
2006-02

Eastern Horseshoe Area, HWMU 16 & SWMUs 13, 48, 49, 50, 51 and 59 April 2006 Sampling Event Groundwater Data Report. Radford Army Ammunition Plant, Radford, Virginia.

Note: This report was submitted as an internal draft in support of an Army Aquisition

June-2006
2007-07 Master Work Plan Addendum 019: SWMUs 48, 49, 50, 59, 41, Area O, FLFA, SWMU 43 and Area P. Final November-2007

2009-08

Appendices

Final SWMU 50 & 59 RCRA Facility Investigation Report. Radford Army Ammunition Plant, Radford, VA. September, 2009

October 23, 2009
SWMU 68 - Chromic Acid Treatment Plant Tanks
2003-04 "Work Plan Addendum No. 16, Site Screening Process for Solid Waste Management Units 13, 37, 38, 46, 57, 68, 69, 75, 76, and Areas of Concern A, F, Q, Radford Army Ammunition Plant, Radford, Virginia." 08-01-2003
2007-02 Site Screening Process Report for Solid Waste Management Units 13, 37, 38, 46, 57, 68, 69, and Areas of Concern A, F, Q, Final, May 2007 06-26-2007
2007-06 Decision Documents for:
SWMU 46: Propellant Burial Area, SWMU 68: Chromic Acid Treatment Tanks,
SWMU 69: Pond by Chromic Acid Treatment Tanks,
SWMU 75: Used Oil Storage Tank (Inert Gas Plant),
SWMU 76: Oil Tanks,
AOC F: Former Drum Storage Area,
No Further Action
August-2007
SWMU 69 - Pond by Chromic Acid Treatment Plant Tanks
1994-04 "Closure Report, SWMU 69, Pond by Chromic Acid Treatment Tanks, Task Order No. 4, Radford Army Ammunition Plant, Virginia." 08-30-1994
2003-04 "Work Plan Addendum No. 16, Site Screening Process for Solid Waste Management Units 13, 37, 38, 46, 57, 68, 69, 75, 76, and Areas of Concern A, F, Q, Radford Army Ammunition Plant, Radford, Virginia." 08-01-2003
2007-02 Site Screening Process Report for Solid Waste Management Units 13, 37, 38, 46, 57, 68, 69, and Areas of Concern A, F, Q, Final, May 2007 06-26-2007
SWMU 71 - Flash Burn Parts Area
1992-03-V1 "Task Order No. 4, Final Draft Verification Investigation, Radford Army Ammunition Plant, Virginia, Volume I of III" 10-29-1992
1992-03-V2 "Task Order No. 4, Final Draft Verification Investigation, Radford Army Ammunition Plant, Virginia, Volume II of III" 10-29-1992

1992-03-V3

"Task Order No. 4, Final Draft Verification Investigation, Radford Army Ammunition Plant, Virginia, Volume III of III"

10-29-1992

1994-03 "Verification Investigation Revised Section 24.0, SWMU 71, Flash Burn Parts Area, Task Order No. 4, Radford Army Ammunition Plant, Virginia" 08-19-1994
2002-04 "Workplan Addendum No. 14, RCRA Facility Investigation at Solid Waste Management Unit 40/71, Radford Army Ammunition Plant, Virginia." 09-01-2002

2009-01

Vol 1

Vol 2

Solid Waste Management Units 40 (RAAP-009) and 71 (RAAP-002) RCRA Facility Investigation/ Corrective Measures Study Report. Radford Army Ammunition Plant, Radford, VA. Final. April, 2009

June 30, 2009
SWMU 75 - Waste Oil Underground Storage Tanks (Inert Gas Plant)
2003-04 "Work Plan Addendum No. 16, Site Screening Process for Solid Waste Management Units 13, 37, 38, 46, 57, 68, 69, 75, 76, and Areas of Concern A, F, Q, Radford Army Ammunition Plant, Radford, Virginia." 08-01-2003
2007-02 Site Screening Process Report for Solid Waste Management Units 13, 37, 38, 46, 57, 68, 69, and Areas of Concern A, F, Q, Final, May 2007 06-26-2007
2007-06 Decision Documents for:
SWMU 46: Propellant Burial Area, SWMU 68: Chromic Acid Treatment Tanks,
SWMU 69: Pond by Chromic Acid Treatment Tanks,
SWMU 75: Used Oil Storage Tank (Inert Gas Plant),
SWMU 76: Oil Tanks,
AOC F: Former Drum Storage Area,
No Further Action
August-2007
SWMU 76 - Waste Oil Underground Storage Tanks
2003-04 "Work Plan Addendum No. 16, Site Screening Process for Solid Waste Management Units 13, 37, 38, 46, 57, 68, 69, 75, 76, and Areas of Concern A, F, Q, Radford Army Ammunition Plant, Radford, Virginia." 08-01-2003
2007-02 Site Screening Process Report for Solid Waste Management Units 13, 37, 38, 46, 57, 68, 69, and Areas of Concern A, F, Q, Final, May 2007 06-26-2007
2007-06 Decision Documents for:
SWMU 46: Propellant Burial Area, SWMU 68: Chromic Acid Treatment Tanks,
SWMU 69: Pond by Chromic Acid Treatment Tanks,
SWMU 75: Used Oil Storage Tank (Inert Gas Plant),
SWMU 76: Oil Tanks,
AOC F: Former Drum Storage Area,
No Further Action
August-2007
HWMU 4
1998-07 "Annual Groundwater Monitoring Report HWMUs 4, 5, 7, 10, 13, 16 & 39. Radford Army Ammunition Plant" March-1999

1999-04 part 1

1999-04 part 2

"Annual Groundwater Monitoring Report HWMUs 4, 5, 7, 10, 13, 16 & 39. Radford Army Ammunition Plant" March-2000
2000-05 "Annual Groundwater Monitoring Report HWMUs 4, 5, 7, 10, 13, 16 & 39. Radford Army Ammunition Plant" March-2001
2002-09 "Annual Groundwater Monitoring Report HWMUs 4, 13 & 39. Radford Army Ammunition Plant" March-2003
HWMU 5 -Surface Impoundment #5
1998-07 "Annual Groundwater Monitoring Report HWMUs 4, 5, 7, 10, 13, 16 & 39. Radford Army Ammunition Plant" March-1999

1999-04 part 1

1999-04 part 2

"Annual Groundwater Monitoring Report HWMUs 4, 5, 7, 10, 13, 16 & 39. Radford Army Ammunition Plant" March-2000
2000-05 "Annual Groundwater Monitoring Report HWMUs 4, 5, 7, 10, 13, 16 & 39. Radford Army Ammunition Plant" March-2001
2001-01 "Alternate Source Demonstration for Trichloroethene, Hazardous Waste Management Unit 5, Radford Army Ammunition Plant, Virginia." 02-01-2001
2001-05 "Annual Groundwater Monitoring Report HWMU 5. Radford Army Ammunition Plant" March-2002
2002-10 "Annual Groundwater Monitoring Report HWMUs 5, 7, 10 & 16. Radford Army Ammunition Plant" March-2003
2003-01 "Field Investigation Report and Risk Assessment. Hazardous Waste Management Unit 5 and 7, Radford Army Ammunition Plant, Radford, Virginia." 03-01-2003
2004-05 "Closure and Post Closure Plan Amendment, Hazardous Waste Management Unit 5, Radford Army Ammunition Plant, Radford, Virginia." 02-01-2004
2007-03 Alternate Source Demonstration for Trichloroethene - Hazardous Waste Management Unit 5, Radford Army Ammunition Plant April-2007
2008-02 Semiannual Groundwater Monitoring Report, HWMUs 5, 7, 10 & 16, Second Quarter, 2008 Radford Army Ammunition Plant, Virginia. August-2008

2009-16

Data

Annual Monitoring Report. Hazardous Waste Management Units 5, 7, 10 & 16- Calendar Year 2009. Radford Army Ammunition Plant, Radford, VA. February, 2010. February-2010

2011-05

Data

Annual Monitoring Report. Hazardous Waste Management Units 5, 7, 10 & 16- Calendar Year 2010. Radford Army Ammunition Plant, Radford, VA. February, 2011. February-2011

2011-21

Annual Groundwater Monitoring Report - HWMUs 5, 7,10 & 16. Calendar Year 2011. Radford Army Ammunition Plant, Radford, VA. Final. February, 2012

February-2012

2012-02

Annual Groundwater Monitoring Report - HWMUs 5, 7,10 & 16. Calendar Year 2012. Radford Army Ammunition Plant, Radford, VA. Final. February, 2013

February-2013

2014-08

Appendices

Annual Groundwater Monitoring Report. HWMUs 5, 10, and 16. Calendar Year 2013. Radford Army Ammunition Plant, Radford, VA. Draft Final. April, 2014

April, 2014

2015-01

Appendices

Annual Groundwater Monitoring Report. HWMUs 5, 10, and 16. Calendar Year 2014. Radford Army Ammunition Plant, Radford, VA. Draft Final. February, 2015

February, 2015

2016-01

Annual Groundwater Monitoring Report. HWMUs 5 and 16. Calendar Year 2015. Radford Army Ammunition Plant, Radford, VA. Draft Final. March, 2016

March, 2016

2017-01

2017-01-App C1

2017-01-App C2

2017-01-App C3

2017-01-Corr

2017-01-Corr (2)

Annual Groundwater Monitoring Report. HWMUs 5 and 16. Calendar Year 2016. Radford Army Ammunition Plant, Radford, VA. Draft Final. March, 2017

March, 2017

2017-02

Permit Modification

2017-02 SAP

2017-02 Att 1 App I

2017-02 Att 2 App E

2017-02 Att 2 App G

2017-02 Att 2 App K

Hazardous Waste Management Post-Closure Care Permit for HWMU 5 and 16, Radford Army Ammunition Plant, Radford, VA

July, 2014
2018-05

2018-05 App C-1

2018-05 App C-2

Annual Groundwater Monitoring Report for HWMUs 5 and 16, Calendar Year 2017. Radford Army Ammunition Plant, Radford, VA February 2018

2019-02

2019-02 App C1

2019-02 App C2

2019-02 Corr

 

Annual Groundwater Monitoring Report for HWMUs 5 and 16, Calendar Year 2018. Radford Army Ammunition Plant, Radford, VA

April 2019

2020-03

2020-03_App C1

2020-03_App C2

2020-03_App C3

Annual Groundwater Monitoring Report for HWMUs 5 and 16, Calendar Year 2019. Radford Army Ammunition Plant, Radford, VA February 2020

2021-02

2021-02_App_C1

2021-02_App_C2

2021-02_App_C3

Annual Groundwater Monitoring Report for HWMUs 5 and 16, Calendar Year 2020. Radford Army Ammunition Plant, Radford, VA May 2021
HWMU 7 -Surface Impoundment #7
1998-07 "Annual Groundwater Monitoring Report HWMUs 4, 5, 7, 10, 13, 16 & 39. Radford Army Ammunition Plant" March-1999

1999-04 part 1

1999-04 part 2

"Annual Groundwater Monitoring Report HWMUs 4, 5, 7, 10, 13, 16 & 39. Radford Army Ammunition Plant" March-2000
2000-05 "Annual Groundwater Monitoring Report HWMUs 4, 5, 7, 10, 13, 16 & 39. Radford Army Ammunition Plant" March-2001
2001-06 "Annual Groundwater Monitoring Report HWMU 7. Radford Army Ammunition Plant" March-2002
2002-10 "Annual Groundwater Monitoring Report HWMUs 5, 7, 10 & 16. Radford Army Ammunition Plant" March-2003
2003-01 "Field Investigation Report and Risk Assessment. Hazardous Waste Management Unit 5 and 7, Radford Army Ammunition Plant, Radford, Virginia." 03-01-2003
2004-03 "Closure and Post Closure Plan Amendment, Hazardous Waste Management Unit 7, Radford Army Ammunition Plant, Radford, Virginia." 02-01-2004
2008-02 Semiannual Groundwater Monitoring Report, HWMUs 5, 7, 10 & 16, Second Quarter, 2008 Radford Army Ammunition Plant, Virginia. August-2008

2009-16

Data

Annual Monitoring Report. Hazardous Waste Management Units 5, 7, 10 & 16- Calendar Year 2009. Radford Army Ammunition Plant, Radford, VA. February, 2010. February-2010

2011-05

Data

Annual Monitoring Report. Hazardous Waste Management Units 5, 7, 10 & 16- Calendar Year 2010. Radford Army Ammunition Plant, Radford, VA. February, 2011. February-2011

2011-21

Annual Groundwater Monitoring Report - HWMUs 5, 7,10 & 16. Calendar Year 2011. Radford Army Ammunition Plant, Radford, VA. Final. February, 2012

February-2012

2012-02

Annual Groundwater Monitoring Report - HWMUs 5, 7,10 & 16. Calendar Year 2012. Radford Army Ammunition Plant, Radford, VA. Final. February, 2013

February-2013

2012-03

Closure Report for Hazardous Waste Management Unit 7. Radford Army Ammunition Plant, Radford, VA. Final. February, 2012

February-2012

2013-02

Closure Report Addendum for Hazardous Waste Management Unit 7. Radford Army Ammunition Plant, Radford, VA. Final. January, 2013

January-2013
HWMU 10 - Closed Equalization Basin
1998-07 "Annual Groundwater Monitoring Report HWMUs 4, 5, 7, 10, 13, 16 & 39. Radford Army Ammunition Plant" March-1999

1999-04 part 1

1999-04 part 2

"Annual Groundwater Monitoring Report HWMUs 4, 5, 7, 10, 13, 16 & 39. Radford Army Ammunition Plant" March-2000
2000-05 "Annual Groundwater Monitoring Report HWMUs 4, 5, 7, 10, 13, 16 & 39. Radford Army Ammunition Plant" March-2001
2001-07 "Annual Groundwater Monitoring Report HWMU 10. Radford Army Ammunition Plant" March-2002
2002-10 "Annual Groundwater Monitoring Report HWMUs 5, 7, 10 & 16. Radford Army Ammunition Plant" March-2003
2008-02 Semiannual Groundwater Monitoring Report, HWMUs 5, 7, 10 & 16, Second Quarter, 2008 Radford Army Ammunition Plant, Virginia. August-2008

2009-16

Data

Annual Monitoring Report. Hazardous Waste Management Units 5, 7, 10 & 16- Calendar Year 2009. Radford Army Ammunition Plant, Radford, VA. February, 2010. February-2010

2011-05

Data

Annual Monitoring Report. Hazardous Waste Management Units 5, 7, 10 & 16- Calendar Year 2010. Radford Army Ammunition Plant, Radford, VA. February, 2011. February-2011

2011-21

Annual Groundwater Monitoring Report - HWMUs 5, 7,10 & 16. Calendar Year 2011. Radford Army Ammunition Plant, Radford, VA. Final. February, 2012

February-2012

2012-02

Annual Groundwater Monitoring Report - HWMUs 5, 7,10 & 16. Calendar Year 2012. Radford Army Ammunition Plant, Radford, VA. Final. February, 2013

February-2013

2014-08

Appendices

Annual Groundwater Monitoring Report. HWMUs 5, 10, and 16. Calendar Year 2013. Radford Army Ammunition Plant, Radford, VA. Draft Final. April, 2014

April, 2014

2015-01

Appendices

Annual Groundwater Monitoring Report. HWMUs 5, 10, and 16. Calendar Year 2014. Radford Army Ammunition Plant, Radford, VA. Draft Final. February, 2015

February, 2015
HWMU 13 - Waste Propellant Burning Ground
1998-07 "Annual Groundwater Monitoring Report HWMUs 4, 5, 7, 10, 13, 16 & 39. Radford Army Ammunition Plant" March-1999

1999-04 part 1

1999-04 part 2

"Annual Groundwater Monitoring Report HWMUs 4, 5, 7, 10, 13, 16 & 39. Radford Army Ammunition Plant" March-2000
2000-05 "Annual Groundwater Monitoring Report HWMUs 4, 5, 7, 10, 13, 16 & 39. Radford Army Ammunition Plant" March-2001
2002-09 "Annual Groundwater Monitoring Report HWMUs 4, 13 & 39. Radford Army Ammunition Plant" March-2003

2009-15

Data Q2

Data Q4

Annual Monitoring Report. Open Burning Ground (Hazardous Waste Management Unit 013) - Calendar Year 2009. Radford Army Ammunition Plant, Radford, VA. February, 2010 February-2010
2011-03 Annual Monitoring Report. Open Burning Ground (Hazardous Waste Management Unit 013) - Calendar Year 2010. Radford Army Ammunition Plant, Radford, VA. February, 2011. February-2011
HWMU 16 - Hazardous Waste Landfill
1998-07 "Annual Groundwater Monitoring Report HWMUs 4, 5, 7, 10, 13, 16 & 39. Radford Army Ammunition Plant" March-1999

1999-04 part 1

1999-04 part 2

"Annual Groundwater Monitoring Report HWMUs 4, 5, 7, 10, 13, 16 & 39. Radford Army Ammunition Plant" March-2000
2000-05 "Annual Groundwater Monitoring Report HWMUs 4, 5, 7, 10, 13, 16 & 39. Radford Army Ammunition Plant" March-2001
2001-08 "Annual Groundwater Monitoring Report HWMU 16. Radford Army Ammunition Plant" March-2002
2002-10 "Annual Groundwater Monitoring Report HWMUs 5, 7, 10 & 16. Radford Army Ammunition Plant" March-2003
2006-02

Eastern Horseshoe Area, HWMU 16 & SWMUs 13, 48, 49, 50, 51 and 59 April 2006 Sampling Event Groundwater Data Report. Radford Army Ammunition Plant, Radford, Virginia.

Note: This report was submitted as an internal draft in support of an Army Aquisition

June-2006
2008-02 Semiannual Groundwater Monitoring Report, HWMUs 5, 7, 10 & 16, Second Quarter, 2008 Radford Army Ammunition Plant, Virginia. August-2008

2009-16

Data

Annual Monitoring Report. Hazardous Waste Management Units 5, 7, 10 & 16- Calendar Year 2009. Radford Army Ammunition Plant, Radford, VA. February, 2010. February-2010

2011-05

Data

Annual Monitoring Report. Hazardous Waste Management Units 5, 7, 10 & 16- Calendar Year 2010. Radford Army Ammunition Plant, Radford, VA. February, 2011. February-2011

2011-21

Annual Groundwater Monitoring Report - HWMUs 5, 7,10 & 16. Calendar Year 2011. Radford Army Ammunition Plant, Radford, VA. Final. February, 2012

February-2012

2012-02

Annual Groundwater Monitoring Report - HWMUs 5, 7,10 & 16. Calendar Year 2012. Radford Army Ammunition Plant, Radford, VA. Final. February, 2013

February-2013

2014-08

Appendices

Annual Groundwater Monitoring Report. HWMUs 5, 10, and 16. Calendar Year 2013. Radford Army Ammunition Plant, Radford, VA. Draft Final. April, 2014

April, 2014

2015-01

Appendices

Annual Groundwater Monitoring Report. HWMUs 5, 10, and 16. Calendar Year 2014. Radford Army Ammunition Plant, Radford, VA. Draft Final. February, 2015

February, 2015

2016-01

Annual Groundwater Monitoring Report. HWMUs 5 and 16. Calendar Year 2015. Radford Army Ammunition Plant, Radford, VA. Draft Final. March, 2016

March, 2016

2017-01

2017-01-App C1

2017-01-App C2

2017-01-App C3

2017-01-Corr

2017-01-Corr (2)

Annual Groundwater Monitoring Report. HWMUs 5 and 16. Calendar Year 2016. Radford Army Ammunition Plant, Radford, VA. Draft Final. March, 2017

March, 2017

2017-02

Permit Modification

2017-02 SAP

2017-02 Att 1 App I

2017-02 Att 3 App E

2017-02 Att 3 App G

Hazardous Waste Management Post-Closure Care Permit for HWMU 5 and 16, Radford Army Ammunition Plant, Radford, VA

July, 2014
2018-05

2018-05 App C-1

2018-05 App C-2

Annual Groundwater Monitoring Report for HWMUs 5 and 16, Calendar Year 2017. Radford Army Ammunition Plant, Radford, VA February 2018

2019-02

2019-02 App C1

2019-02 App C2

2019-02 Corr

 

Annual Groundwater Monitoring Report for HWMUs 5 and 16, Calendar Year 2018. Radford Army Ammunition Plant, Radford, VA

April 2019

2020-03

2020-03_App C1

2020-03_App C2

2020-03_App C3

Annual Groundwater Monitoring Report for HWMUs 5 and 16, Calendar Year 2019. Radford Army Ammunition Plant, Radford, VA February 2020

2021-02

2021-02_App_C1

2021-02_App_C2

2021-02_App_C3

Annual Groundwater Monitoring Report for HWMUs 5 and 16, Calendar Year 2020. Radford Army Ammunition Plant, Radford, VA May 2021
HWMU 39 -Incinerator Spray Pond adjacent to SWMU 39
1998-01 Risk Assessment and Closure Certification for the Former Incinerator Spray Pond at the Radford Army Ammunition Plant. 01-01-1998
1998-07 "Annual Groundwater Monitoring Report HWMUs 4, 5, 7, 10, 13, 16 & 39. Radford Army Ammunition Plant" March-1999
1999-02 "Closure Documentation for Hazardous Waste Management Unit 39, Incinerator Spray Pond, Radford Army Ammunition Plant, Radford, VA., Volume I" 05-03-1999

1999-04 part 1

1999-04 part 2

"Annual Groundwater Monitoring Report HWMUs 4, 5, 7, 10, 13, 16 & 39. Radford Army Ammunition Plant" March-2000
2000-05 "Annual Groundwater Monitoring Report HWMUs 4, 5, 7, 10, 13, 16 & 39. Radford Army Ammunition Plant" March-2001
2002-09 "Annual Groundwater Monitoring Report HWMUs 4, 13 & 39. Radford Army Ammunition Plant" March-2003
2007-12

Correspondence
"Closure Evalution for Hazardous Waste Management Unit 39. Radford Army Ammunition Plant" September-2007
Site Screening Areas/ Miscellaneous Sites

2009-03

Work Plan Addendum 028 - Site Screening Process at Site Screening Areas 18, 72, 30, 79, 60 and 77. Radford Army Ammunition Plant, Radford, VA. Final. June, 2009.

June-2009
2010-10 Final Site Screening Process Report for Site Screening Areas 18, 72, 30, 79, 60 and 77. Radford Army Ammunition Plant, Radford, VA. Final. December, 2010. December-2010
2010-11 Corrective Action Unit Evaluation for TNT Unit Wastewater Treatment Areas (SSAs 2, 3, 81 and MUs 2, 4). RFAAP, Radford, VA. Final. June, 2010. June-2010

2011-08

Corrective Action Unit Evaluation for Rocket Area Wastewater Holding Lagoons (SSAs 22, 23, 24 and 25). RFAAP, Radford, VA. Final. May, 2010. May-2010

2011-09

Corrective Action Unit Evaluation for Nitroglycerin Area Units (SSAs 11, 12 and MU 5). RFAAP, Radford, VA. Final. July, 2010. July-2010

2011-10

Corrective Action Unit Evaluation for Assorted Units (SSA 70, 80, SWMU 61) at Radford Army Ammunition Plant. RFAAP, Radford, VA. Final. August, 2010. August-2010

2011-12

Corrective Action Unit Evaluation for Acidic Wastewater Treatment Units (SSAs 63, 64, 65, 66, 67 and SWMU 9). RFAAP, Radford, VA. Final. April, 2010. April-2010
New River Unit Sites
1993-01 "Defense Environmental Restoration Program for Formerly Used Defense Sites, Ordnance and Explosive Waste Chemical Warfare Materials Archives Search Report, New River Ordnance Plant, Radford, Virginia." 09-01-1993
2002-02 Old Data for New River Ordnance Plant 06-10-2002
2002-06 "Workplan Addendum 012 : Site Characterization Plan for SWMUs 39, 48, 49, 50, 58, & 59, AOC-FLFA, AOC-Building 4343 & New River Unit, Radford Army Ammunition Plant, Virginia." 09-01-2002
2002-06-A "Work Plan Addendum 012, Appendix A: Previous Investigation Analytical Results Tables, Site Characterization Plan for SWMUs 39, 48, 49, 50, 58, & 59, AOC-FLFA, AOC-Building 4343 & New River Unit, Radford Army Ammunition Plant, Virginia." 09-01-2002
2004-07 "NRU Additional Characterization Sampling: Work Instructions, Final Document, Radford Army Ammunition Plant, Radford, Virginia." 05-01-2004

2007-05

Appendices

New River Unit Additional Characterization Sampling & Groundwater Investigation Data Report October-2007

2009-05

Appendices

Draft Remedial Investigation Work Plan Addendum 027 -New River Unit - RAAP-044. Radford Army Ammunition Plant, Radford, VA. Draft. June, 2008.

Note: The Draft Work Plan was approved without changes by VDEQ and is considered Final

June-2009

2009-06

Draft Supplemental Remedial Investigation Work Plan for the New River Unit - RFAAP-NRU. Radford Army Ammunition Plant, Radford, VA. Draft. June, 2009.

Note: The Draft Work Plan was approved without changes by VDEQ and is considered Final

June-2009

2009-09

Final Engineering Evaluation/Cost Analysis Northern Burning Ground - New River Unit. Radford Army Ammunition Plant, Radford, VA. July, 2009

August 20, 2009

2009-12

Final Removal Action Work Plan for the Northern Burning Ground, New River Unit. Radford Army Ammunition Plant, Radford, VA. December, 2009

December-2009
2010-03 Remedial Investigation Report: New River Unit (RAAP-044), BDDT, BLA, IAA, RY, WBG and Groundwater. Radford Army Ammunition Plant, Radford, VA. Final. Volumes I and II, June, 2010. June-2010
2010-07 Feasibility Study Report - New River Unit (RAAP-44) Bag Loading Area, Igniter Assembly Area, Building Debris Disposal Trench and Western Burning Ground. Radford Army Ammunition Plant, Radford, VA. Final. September, 2010. September-2010
2010-08 Proposed Plan for New River Unit (RAAP-44) - Radford Army Ammunition Plant, Radford, VA. Final. September, 2010. September-2010

2011-07

Final Remedial Action Work Plan for the Bag Loading Area, the Igniter Assembly Area and the Building Debris Disposal Trench. Radford Army Ammunition Plant, Radford, VA. Final. November, 2010. November-2010

2011-18

Final Remedial Action Work Plan for the Western Burning Ground, New River Unit (RAAP-044). Radford Army Ammunition Plant, Radford, VA. Final. April, 2011 April-2011

2011-19

Monitoring Well Abandonment Work Plan, New River Unit (RAAP-044). Radford Army Ammunition Plant, Radford, VA. Draft. April, 2011

Note: The Draft Work Plan was approved without changes by VDEQ and is considered Final

April-2011

2011-20

Final Response Action Completion and Closure Report for Northern Burning Ground, New River Unit (RAAP-044). Radford Army Ammunition Plant, Radford, VA. Final. October, 2010 October-2010

2013-03

Decision Document for Radford Army Ammunition Plant - New River Unit (RAAP-044) . Radford Army Ammunition Plant, Radford, VA. Final. November, 2011

November-2011

2013-05

Land Use Control Implementation Plan for Radford Army Ammunition Plant - New River Unit (RAAP-044) . Radford Army Ammunition Plant, Radford, VA. Final. August, 2013

September 30, 2013

2013-06

Response Action Completion and Closure Report for Bag Loading Area, Igniter Assembly Area and Western Burning Ground, New River Unit (RAAP-044) . Radford Army Ammunition Plant, Radford, VA. Final. September 2013

September 30, 2013

2017-05

Annual Inspection of Closed Installation Restoration Program (IRP) Areas. Radford Army Ammunition Plant, Radford, VA. June 2014

August 23, 2017

2017-06

Annual Inspection of Closed Installation Restoration Program (IRP) Areas. Radford Army Ammunition Plant, Radford, VA. November 2015

August 23, 2017

2017-07

Annual Inspection of Closed Installation Restoration Program (IRP) Areas. Radford Army Ammunition Plant, Radford, VA. September 2016

August 23, 2017

2018-08

Annual Inspection of Closed Installation Restoration Program (IRP) Areas. Radford Army Ammunition Plant, Radford, VA. April 2018

April 2018

2018-09

2018-09_Corr

 

Final First Five-Year Review Report for New River Unit (RAAP-044), Radford Army Ammunition Plant, Radford, Virginia, May 2018

May 2018
AOC A - Nitrocellulose Rainwater Ditch

2008-14

Appendices

RFI Workplan -RAAP-031 (Area of Concern A) Nitrocellulose Rainwater Ditch. Radford Army Ammunition Plant, Radford, VA. Draft. June, 2008

June-2008

2009-10

Final RFI Report - RAAP-031: Area of Concern A - Nitrocellulose Rainwater Ditch. Radford Army Ammunition Plant, Radford, VA. July, 2009

October 23, 2009

2009-14

Draft Work Plan Addendum 29. Supplemental RFI/CMS Work Plan. RAAP-031: Area of Concern A- Nitrocellulose Rainwater Ditch . Radford Army Ammunition Plant, Radford, VA. September, 2009.

Note: The Draft Work Plan was approved without changes by EPA/VDEQ and is considered Final

January-2010
AOC Building 4343
2002-06 "Workplan Addendum 012 : Site Characterization Plan for SWMUs 39, 48, 49, 50, 58, & 59, AOC-FLFA, AOC-Building 4343 & New River Unit, Radford Army Ammunition Plant, Virginia." 09-01-2002
2002-06-A "Work Plan Addendum 012, Appendix A: Previous Investigation Analytical Results Tables, Site Characterization Plan for SWMUs 39, 48, 49, 50, 58, & 59, AOC-FLFA, AOC-Building 4343 & New River Unit, Radford Army Ammunition Plant, Virginia." 09-01-2002
2004-02 "Building 4343 RCRA Facility Investigation / Corrective Measures Study Report, Radford Army Ammunition Plant, Virginia." 02-01-2004
2006-01 Building 4343 Interim Measures Workplan, Radford Army Ammunition Plant, Radford, Virginia. 10-20-2006
2007-01

Building 4343 Interim Measures Completion Report, Radford Army Ammunition Plant, Radford, Virginia Final Document, April 2007

06-19-2007
AOC - Former Lead Furnace Area
2002-06 "Workplan Addendum 012 : Site Characterization Plan for SWMUs 39, 48, 49, 50, 58, & 59, AOC-FLFA, AOC-Building 4343 & New River Unit, Radford Army Ammunition Plant, Virginia." 09-01-2002
2002-06-A "Work Plan Addendum 012, Appendix A: Previous Investigation Analytical Results Tables, Site Characterization Plan for SWMUs 39, 48, 49, 50, 58, & 59, AOC-FLFA, AOC-Building 4343 & New River Unit, Radford Army Ammunition Plant, Virginia." 09-01-2002
2007-07 Master Work Plan Addendum 019: SWMUs 48, 49, 50, 59, 41, Area O, FLFA, SWMU 43 and Area P. Final November-2007

2008-10

Appendices

Former Lead Furnace Area RCRA Facility Investigation/ Corrective Measures Study. Radford Army Ammunition Plant, Radford, VA. Final. November, 2008

December 19, 2008

2008-12

Appendices

Former Lead Furnace Area (FLFA) Interim Measures Work Plan. Radford Army Ammunition Plant, Radford, VA. Draft. November, 2008

Note: The Draft Work Plan was approved without changes by USEPA and VDEQ and is considered Final

March-2009

2010-02

Appendices

Interim Measures Completion Report: SWMU 51, SWMU 39 and FLFA. Radford Army Ammunition Plant, Radford, VA. Final. February, 2010. February-2010
AOC O - Underground Fuel Oil Spill
1994-07 "RCRA Facility Investigation Revised Section 8.0, SWMU O, Underground Fuel Oil Spill, Task Order No. 4, Radford Army Ammunition Plant, Virginia." 09-16-1994
2007-07 Master Work Plan Addendum 019: SWMUs 48, 49, 50, 59, 41, Area O, FLFA, SWMU 43 and Area P. Final November-2007

2008-13

Appendices

Area of Concern (AOC) O Underground Fuel Oil Spill RCRA Facility Investigation (RFI)/Corrective Measures Study (CMS). Radford Army Ammunition Plant, Radford, VA. Draft. August, 2008

Note: Transfer from VDEQ's RCRA Corrective Action Program to the VDEQ Regional Office LUST Program was based on the Draft Document and is now considered Final.

April 29, 2009
AOC P - Battery Storage Area
2007-07 Master Work Plan Addendum 019: SWMUs 48, 49, 50, 59, 41, Area O, FLFA, SWMU 43 and Area P. Final November-2007

2010-06

Appendices

Area of Concern P (RAAP-37) RCRA Facility Investigation. Radford Army Ammunition Plant, Radford, VA. Final. September, 2010. September-2010
RAAP-046 PFAS
2021-01 Final USAEC Per- and Polyfluoroalkyl Substances Preliminary Assessment/Site Inspection Radford Army Ammunition Plant, Virginia February 2021
RAAP-047  (Bldgs 1549, 1041 & 1034)
2008-06 Master Work Plan Addendum 025: TCE Plume at Bldgs 1549, 1041, 1034 (RAAP-047). Final. May, 2008 August 6, 2008

2009-11

Final RFI Report - RAAP-047: Buildings 1549, 1041 & 1034. Radford Army Ammunition Plant, Radford, VA. September, 2009

October 23, 2009
Army Reserve Small Arms Range

2009-02

Site Screening Process (SSP) Report for the Army Reserve Small Arms Range Military Munitions Response Program Site, Radford Army Ammunition Plant, Radford, VA. Final. May, 2009.

July 30, 2009

2011-04

Appendices

Final Army Reserve Small Arms Range RFI/IM Work Plan. Radford Army Ammunition Plant, Radford, VA. Final. March, 2011. April-2011

2014-02

Appendices

Army Reserve Small Arms Range (ARSAR) (RFAAP-01-R-001) RCRA Facility Investigation (RFI) Interim Measures Completion Report. Radford Army Ammunition Plant, Radford, VA. Final. November, 2013

January 14, 2014
Former Gun, Mortar Range
2018-06

2018-06 Correspondence

Final Work Plan, Former Gun and Mortar Range Munitions Response Site (RFAAP-001-R-01) Site Investigation, Radford Army Ammunition Plant, Radford, VA May 2018
2018-07

2018-07 Correspondence

Former Gun and Mortar Range Munitions Response Site (RFAAP-001-R-01) Site Investigation, Radford Army Ammunition Plant, Radford, VA September 2018

2020-04

2020-04_Corr_C1

2020-04_Corr_C2

2020-04_Corr_C3

2020-04_Corr_C4

2020-04_Corr_C5

2020-04_Corr_C6

2020-04_Corr_C7

2020-04_Corr_C8

2020-04_Corr_C9

2020-04_Corr_C10

2020-04_Corr_C11

Final Quality Assurance Project Plan for Former Gun and Trench Mortar Range Munitions Response Site. Radford Army Ammunition Plant, Radford, VA June 2020
END
 
Links Site Map Contact Search

spacer graphic
spacer graphic
spacer graphic
spacer graphic
spacer graphic
spacer graphic
spacer graphic
spacer graphic
spacer graphic
spacer graphic
spacer graphic

information repository community involvement investigative activities aboutabout investigative activities community involvement information repositoryinformation repository community involvement investigative activities about